Cruising Design International Will Be Closed From May 30 – June 7th.
Replacement part orders received by May 27th will be shipped by May 29th. Orders placed after May 27th will ship by June 10th.
Replacement luff or full furlers will ship on June 9th.
Welcome, looking for help or replacement parts?
Looking For Replacment Parts For Your ?
Download the CDI Parts List Manual
| Manual Reference # | Description | Part # |
| A | Luff | LFF1 |
| B | Furling Drum Assembly | 2017 |
| C | Luff Support Pin (3/16″ x 2 1/32″) | 2009 |
| D | Anchor Pin | 1998 |
| Shackle | 2007 | |
| E | Main Bearing, HDPE plastic (standard) or | 1033 |
| Ball Bearing, torlon balls (optional) | BB2 | |
| F | Cup, stainless steel | 1872 |
| G | Antirotation Strap | 1081 |
| H | Ferrule (the little metal tube swaged on halyard) | — |
| J | Halyard Top Fitting | 1995 |
| K | Halyard Assembly, ¼” x 25’ | 2008 |
| L | Tack Tension Line, 1/8” x 4’ | 11921 |
| M | Thrust Washer | 1253 |
Showing 9–12 of 15 results




Showing 9–12 of 15 results